Data Center Infrastructure Development Platform

GPU-ready data centers in months, not years.

AI capacity is not blocked by GPUs. It is blocked by design, power, permitting, and procurement. Stratum clears all four before you commit a dollar. Bring your hardware. Or bring your capital.

1.One engineered design: 2 MW and 5 MW blocks. Campuses grow by repeating them.
2.A portfolio of vetted regions, each evaluated for power, permitting, water, and fiber.
3.Buy your build-out, or finance it through Stratum and keep your capital in hardware.
4.Built with ES Development & Management. In association with Prime Solves. Decades of infrastructure delivery stand behind the numbers.
What "GPU-ready" means
Infrastructure complete: power, water, gas, the full immersion tank system, and immersion-ready server racks, engineered and operational. You bring the hardware. Drop in your servers and go live. We never sell compute, and we never touch your tech stack.
Section 01 · Portfolio

The portfolio

View all regions →

Every region here was evaluated against the same five gates: power, permitting, water, fiber, community fit. Each card shows exactly where the work stands today, and the status updates as deals move. Specific parcels are discussed under NDA.

Region Record · Nevada Evaluating

Northern Nevada

Nevada · Tier 1
Acreage Band
~50 acres
Campus Potential
100 MW

Established industrial power infrastructure in NV Energy territory, with substation capacity adjacent to entitled land and park-scale on-site generation in the region.

BLOCK CAPEX $61.4M / 5 MW
View region
Region Record · Texas Evaluating

West Texas / ERCOT

Texas · Tier 1
Acreage Band
~500 acres
Campus Potential
1,000 MW

ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.

BLOCK CAPEX $61.4M / 5 MW
View region
Region Record · Oklahoma Evaluating

Northeast Oklahoma

Oklahoma · Tier 1
Acreage Band
~125 acres
Campus Potential
250 MW

GRDA public-power territory with master-planned industrial park capacity and hyperscale precedent already in the market: Google operates in the region.

BLOCK CAPEX $61.4M / 5 MW
View region

Directional estimates from conservative planning-grade assumptions. Engineered pro formas are prepared per site on request.

Section 02 · The Model

The model, in numbers

One proprietary immersion-cooled design, engineered once, deployed in repeatable blocks. No chillers. A microgrid as the design default, so time-to-power does not wait in a utility queue.

Designed Blocks
2 / 5 MW
Engineered building blocks; campuses scale by phased repetition
Deployment Target
6-9 mo
Designed for 6 to 9 months to power-on per block, vendors pre-sourced
Design PUE
~1.07
Versus the 1.58 air-cooled industry average (EIA/ASHRAE-sourced data)
Chillers
0
Immersion cooling with proprietary heat rejection systems; no refrigerants
Path 01 · Purchase

Buy the build-out

Lease the space, own your build-out. Direct clients commit through progress agreements tied to build milestones. Your campus, your schedule, our execution.

Path 02 · Finance

Finance through Stratum

Keep your capital in hardware. Stratum finances the build-out over a roughly ten-year term: one predictable payment alongside your space lease.

Want your scenario, not ours? Run the calculator. Pick a tier, a power source, and your utility rate. It returns indicative CapEx, OpEx, and payback from the same planning assumptions we use ourselves.

Section 03 · The team behind the platform

Not a startup. A development chain that already builds at scale.

Stratum Data Centers pairs a proprietary immersion-cooled modular campus design with ES Development & Management, Corp., a commercial general contractor with a dedicated data center division and decades of mechanical and electrical infrastructure delivery. In association with Prime Solves, the capital platform.

ES Development & Management
Construction & data center engineering
Prime Solves
Capital platform
Read the partnership announcement
Section 04 · Let's talk

Let's talk

Three ways in. Tell us which one you are and we will skip straight to what matters.

AI Investor

Fund the build-out

Hard-asset AI infrastructure where operating responsibility sits with the tenant, not the owner. The microgrid-first design brings its own power plant, so the project does not wait in a utility interconnection queue. Deal structures vary by site and are discussed privately.

I'm an investor
AI Data Center Operator

Get capacity

Your GPUs have outgrown air cooling. Our design runs them at full clock, cuts the power bill, and targets 6 to 9 months to power-on. Already own a building or land? We build on your site too.

I need capacity
AI Broker

Bring us a deal

You have the capital or the client. Deals die in the design-cost-timeline gap; we close it. Register your introduction before you forward anything: it is logged to you, with a date, from the first contact.

I'm a broker

Nothing on this site is an offer to sell or a solicitation of an offer to buy any security. Inquiries start a private conversation; they commit nobody to anything.