Established industrial power infrastructure in NV Energy territory, with substation capacity adjacent to entitled land and park-scale on-site generation in the region.
AI capacity is not blocked by GPUs. It is blocked by design, power, permitting, and procurement. Stratum clears all four before you commit a dollar. Bring your hardware. Or bring your capital.
Every region here was evaluated against the same five gates: power, permitting, water, fiber, community fit. Each card shows exactly where the work stands today, and the status updates as deals move. Specific parcels are discussed under NDA.
Established industrial power infrastructure in NV Energy territory, with substation capacity adjacent to entitled land and park-scale on-site generation in the region.
ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.
GRDA public-power territory with master-planned industrial park capacity and hyperscale precedent already in the market: Google operates in the region.
Directional estimates from conservative planning-grade assumptions. Engineered pro formas are prepared per site on request.
One proprietary immersion-cooled design, engineered once, deployed in repeatable blocks. No chillers. A microgrid as the design default, so time-to-power does not wait in a utility queue.
Lease the space, own your build-out. Direct clients commit through progress agreements tied to build milestones. Your campus, your schedule, our execution.
Keep your capital in hardware. Stratum finances the build-out over a roughly ten-year term: one predictable payment alongside your space lease.
Want your scenario, not ours? Run the calculator. Pick a tier, a power source, and your utility rate. It returns indicative CapEx, OpEx, and payback from the same planning assumptions we use ourselves.
Stratum Data Centers pairs a proprietary immersion-cooled modular campus design with ES Development & Management, Corp., a commercial general contractor with a dedicated data center division and decades of mechanical and electrical infrastructure delivery. In association with Prime Solves, the capital platform.
Three ways in. Tell us which one you are and we will skip straight to what matters.
Hard-asset AI infrastructure where operating responsibility sits with the tenant, not the owner. The microgrid-first design brings its own power plant, so the project does not wait in a utility interconnection queue. Deal structures vary by site and are discussed privately.
I'm an investorYour GPUs have outgrown air cooling. Our design runs them at full clock, cuts the power bill, and targets 6 to 9 months to power-on. Already own a building or land? We build on your site too.
I need capacityYou have the capital or the client. Deals die in the design-cost-timeline gap; we close it. Register your introduction before you forward anything: it is logged to you, with a date, from the first contact.
I'm a brokerNothing on this site is an offer to sell or a solicitation of an offer to buy any security. Inquiries start a private conversation; they commit nobody to anything.