Northern Nevada
Established industrial power infrastructure in NV Energy territory, with substation capacity adjacent to entitled land and park-scale on-site generation in the region.
Every region below was evaluated against the same five gates: power availability, permitting posture, water reality, fiber, and community fit. Each region shows exactly where the work stands today, and the status updates as deals move. Specific parcels are reserved for qualified conversations under NDA.
Established industrial power infrastructure in NV Energy territory, with substation capacity adjacent to entitled land and park-scale on-site generation in the region.
ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.
GRDA public-power territory with master-planned industrial park capacity and hyperscale precedent already in the market: Google operates in the region.
AEP Ohio territory with staged utility service growth on entitled land and high-voltage transmission nearby.
Established technology corridor in SRP territory: Apple, Google, and Meta run large campuses in the corridor.
About the block CapEx figure: it repeats across regions on purpose. The engineered block costs the same to build everywhere on a planning basis; what changes by region is your energy price, water mode, and timeline. Site-specific factors land in the engineered pro forma.
Directional estimates from conservative planning-grade assumptions. Engineered pro formas are prepared per site on request.