Region Record · Ohio

Central Ohio

Tier 1 Evaluating 100 MW campus potential
Regional benefits
Why this region UPDATED 2026-07-28
1.AEP Ohio territory with staged utility service growth on entitled land and high-voltage transmission nearby.
2.Zoning permits data centers by right: shovel-ready inside a year on the strongest parcels.
3.Water, sewer, and gas trunk infrastructure in place or under construction.
4.Midwest fiber crossroads in an established hyperscale cluster: AWS, Google, and Meta all build in the Columbus market.
Specific sites Specific parcels are under evaluation in this region right now. Exact locations, acreage, and site packages are shared in qualified conversations under NDA. Qualified means a named entity and a stated MW or check range; the NDA and the site conversation follow from there. That discretion protects the deals, and the people who bring them.
Expansion path

One design, three scales. Every campus in this region starts from the same engineered blocks, so no phase waits on new engineering.

Step 01

2 MW edge block

The designed entry point. About one acre of site (one acre per two megawatts), a hall smaller than 1,000 square feet. It fits an industrial parcel, or a building you already own.

Step 02

5 MW designed blocks

The core building block, with dual-loop redundancy. The first loop earns revenue before the second loop's capital is committed.

Step 03

Campus scale

Campuses grow by repeating the designed blocks toward this region's potential. Each phase stands on its own economics.

Related regions

Elsewhere in the portfolio

View all regions →
Region Record · Nevada Evaluating

Northern Nevada

Nevada · Tier 1
Acreage Band
~50 acres
Campus Potential
100 MW

Established industrial power infrastructure in NV Energy territory, with substation capacity adjacent to entitled land and park-scale on-site generation in the region.

BLOCK CAPEX $61.4M / 5 MW
View region
Region Record · Texas Evaluating

West Texas / ERCOT

Texas · Tier 1
Acreage Band
~500 acres
Campus Potential
1,000 MW

ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.

BLOCK CAPEX $61.4M / 5 MW
View region
Region Record · Oklahoma Evaluating

Northeast Oklahoma

Oklahoma · Tier 1
Acreage Band
~125 acres
Campus Potential
250 MW

GRDA public-power territory with master-planned industrial park capacity and hyperscale precedent already in the market: Google operates in the region.

BLOCK CAPEX $61.4M / 5 MW
View region